Monday, May 11, 2009
Great Idea
Kate
Wednesday, April 8, 2009
Spagetti Wiring
After laying awake many nights planning the electrical-I screwed up. There is suppose to be a plug right where the first turn up on the right is. So I will have to put the plug to the right, near the corner, as there is going to be a floor lamp there-which I finally found. The plug outlet has two receptors so I could plug two things in it. I can not stand to make a mistake on my miniature stuff-this will haunt me forever. Tomorrow I am sauteing a wire out over the right door for the conservatory and a wire where the hinge is-I will put a plug in on both ends of the wires so they can plug into outlets-then I can put carriage lights at the front door. I hope to finish the wiring tomorrow, check the electricity flow, lay the floor, paint the last four murals. I am putting in a ceiling fixture and painting cranes flying around it-about 4 cranes. Think I can do all that tomorrow. LOL.
Kate
Tuesday, March 24, 2009
Setting the Stage in the Living Room
Sunday, March 22, 2009
Off and Running
Kate
Friday, March 20, 2009
Up is the Phoenix from the Ashes
Thanks for looking,
Kate