Tuesday, April 24, 2012

Addition Edition

The addition to the dollhouse is two story, two room.  The bottom room is going to be a rooster themed kitchen and the up stairs is a bathroom.  The board to the left is a floor.  The pencil line is where the edge of the board fits into the wall.  The drilled holes are so the Dremel saw blade can turn and cut a straight line.  All of this is to make a space to slide the electric tape up the wall through the floor.
 The next two pictures are of the floors finished being cut out.  Next I have to Kiltz the Addition pieces.  Too many steps-my head hurts.  Hope to post again soon.

Kate >^..^<

Monday, April 9, 2012

Dining Room Ceiling Molding

 I base coated the flowered resin molding with flat paint--should have used two coats--oh well !!












Now I am painting each little flower, pink and blue.  The vines and leaves are a pale green.  It matches the wallpaper perfectly.










This is the finished piece.  I got the glue and could not get the top off (unhappy face).  So I am blogging.  I guess I will work on the wizard room--Yea!!!

Thanks for looking,
Kate >^..^<